![Dublin Waste to Energy [Pic Credit Blathnaid Mc Polin]](https://seanduke.blog/wp-content/uploads/2018/03/dublin-waste-to-energy-pic-credit-blathnaid-mc-polin.jpg?w=616)
The Covanta Dublin Waste to Energy plant is now operating at full capacity, but questions remain around the safety and potential public health impact of the plant.
I visited the plant on 15th March 2018 to put these questions to its General Manager, John Daly, and to take a close up look at the technology that is required to incinerate 600,000 tonnes of black bin waste.
Listen below to the piece broadcast on Drivetime on 26th March 2018.